Open shop scheduling games
From MaRDI portal
Publication:2239840
Abstract: This paper takes a game theoretical approach to open shop scheduling problems with unit execution times to minimize the sum of completion times. By supposing an initial schedule and associating each job (consisting in a number of operations) to a different player, we can construct a cooperative TU-game associated with any open shop scheduling problem. We assign to each coalition the maximal cost savings it can obtain through admissible rearrangements of jobs' operations. By providing a core allocation, we show that the associated games are balanced. Finally, we relax the definition of admissible rearrangements for a coalition to study to what extend balancedness still holds.
Recommendations
Cites work
- Cooperation in one machine scheduling
- Cores of convex games
- Flow-shops with a dominant machine
- scientific article; zbMATH DE number 3139280 (Why is no real title available?)
- scientific article; zbMATH DE number 2109192 (Why is no real title available?)
- On a new class of parallel sequencing situations and related games
- On games corresponding to sequencing situations with ready times
- On the balancedness of multiple machine sequencing games
- On the balancedness of relaxed sequencing games
- On the convexity of games corresponding to sequencing situations with due dates.
- On the convexity of step out-step in sequencing games
- Open Shop Scheduling to Minimize Finish Time
- Openshop and flowshop scheduling to minimize sum of completion times
- Proportionate flow shop games
- Relaxed sequencing games have a nonempty core
- Scheduling the Open Shop to Minimize Mean Flow Time
- Scheduling. Theory, algorithms, and systems.
- Sequencing and Cooperation
- Sequencing games
- Step out-step in sequencing games
Cited in
(6)
This page was built for publication: Open shop scheduling games
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2239840)