Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization
DOI10.1007/s10951-014-0374-0zbMath1320.90034OpenAlexW2002496645MaRDI QIDQ2356121
Bo Guo, Ping Jiang, Ya-Jie Liu, Jian-Jun Qi
Publication date: 28 July 2015
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-014-0374-0
project schedulingmodified particle swarm optimizationforward activity listmulti-mode resource availability cost problemschedule generation
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Uses Software
Cites Work
- Unnamed Item
- A new heuristic approach for unit commitment problem using particle swarm optimization
- A double genetic algorithm for the MRCPSP/max
- Reactive scheduling in the multi-mode RCPSP
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
- An improved particle swarm optimization algorithm for flowshop scheduling problem
- An exact algorithm for minimizing resource availability costs in project scheduling
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
- A tabu search approach for the resource constrained project scheduling problem
- PSPLIB -- a project scheduling problem library
- An exact algorithm for project scheduling with multiple modes
- Active and stable project scheduling
- A theoretical study on the behavior of simulated annealing leading to a new cooling schedule
- Analysis of static simulated annealing algorithms
- Scatter search. Methodology and implementation in C. With CD-ROM.
- Hierarchical models for multi-project planning and scheduling
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- Scatter search for the vehicle routing problem with time windows
- Scatter search for project scheduling with resource availability cost
- Memetic algorithms
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
This page was built for publication: Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization