An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
From MaRDI portal
Publication:657259
DOI10.1007/s10951-009-0125-9zbMath1230.90085OpenAlexW2083823805MaRDI QIDQ657259
Agustín Barrios, Vicente Valls, Francisco Ballestín
Publication date: 16 January 2012
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-009-0125-9
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (6)
Solving RCPSP/max by lazy clause generation ⋮ Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources ⋮ A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting ⋮ Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- Justification and RCPSP: a technique that pays
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- Scheduling of Project Networks by Job Assignment
- Depth-First Search and Linear Graph Algorithms
- Principles and Practice of Constraint Programming – CP 2004
- Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
- A constraint-based method for project scheduling with time windows
This page was built for publication: An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags