The new Fundamental Tree Algorithm for production scheduling of open pit mines

From MaRDI portal
Revision as of 15:59, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:856303


DOI10.1016/j.ejor.2005.12.035zbMath1110.90033OpenAlexW1972121892MaRDI QIDQ856303

Salih Ramazan

Publication date: 7 December 2006

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2005.12.035



Related Items

An integrated approach for earthwork allocation, sequencing and routing, Optimization-based heuristics for underground mine scheduling, Long term production planning of open pit mines by ant colony optimization, Concurrent open-pit mine production and in-pit crushing–conveying system planning, Production phase and ultimate pit limit design under commodity price uncertainty, Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty, MineLib: a library of open pit mining problems, A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty, A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines, Constructing branching trees of geostatistical simulations, A real-world mine excavators timetabling methodology in open-pit mining, Production scheduling with uncertain supply: a new solution to the open pit mining problem, Effective solution of the long-term open pit production planning problem using block clustering, Tailored Lagrangian relaxation for the open pit block sequencing problem, A local branching heuristic for the open pit mine production scheduling problem, Optimizing the open pit-to-underground mining transition, Linear models for stockpiling in open-pit mine production scheduling problems, LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity, Optimizing a mineral value chain with market uncertainty using Benders decomposition, A sliding time window heuristic for open pit mine block sequencing, A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS, A new MIP model for mine equipment scheduling by minimizing maintenance cost, Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing



Cites Work