Time-optimal control in a single machine problem with resource constraints
From MaRDI portal
Publication:1086143
DOI10.1016/0005-1098(86)90014-2zbMath0608.90044OpenAlexW1987971040MaRDI QIDQ1086143
Publication date: 1986
Published in: Automatica (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0005-1098(86)90014-2
Related Items (31)
Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption ⋮ Job-shop scheduling with convex models of operations ⋮ A survey of scheduling with controllable processing times ⋮ Single machine scheduling problems with resource dependent release times ⋮ Single machine scheduling problem with controllable processing times and resource dependent release times ⋮ Single machine batch scheduling with deadlines and resource dependent processing times ⋮ Single-machine scheduling with time-and-resource-dependent processing times ⋮ General flow-shop scheduling with resource constraints ⋮ Scheduling with controllable release dates and processing times: Makespan minimization ⋮ Scheduling with controllable release dates and processing times: total completion time minimization ⋮ A bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due dates ⋮ Single machine scheduling with a variable common due date and resource-dependent processing times. ⋮ Single machine batch scheduling with jointly compressible setup and processing times. ⋮ Considerations of single-machine scheduling with deteriorating jobs ⋮ A multi-objective approach to resource allocation in single machine scheduling ⋮ Single machine scheduling problem with a common deadline and resource dependent release dates ⋮ Single-machine scheduling problems with an aging effect ⋮ Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms ⋮ A note on single-machine scheduling with decreasing time-dependent job processing times ⋮ Single machine scheduling problems with deteriorating jobs ⋮ Single machine scheduling with resource dependent release times and processing times ⋮ Single machine group scheduling with resource dependent setup and processing times ⋮ Scheduling two agents with controllable processing times ⋮ Group scheduling with controllable setup and processing times: minimizing total weighted completion time ⋮ SCHEDULING WITH DISCRETELY COMPRESSIBLE RELEASE DATES TO MINIMIZE MAKESPAN ⋮ Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling ⋮ Single machine batch scheduling with resource dependent setup and processing times ⋮ Minimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problem ⋮ On minimizing resource consumption with constraints on the makespan and the total completion time ⋮ Minimization of the makespan in a two-machine problem under given resource constraints ⋮ Single machine earliness-tardiness scheduling with resource-dependent release dates
Cites Work
This page was built for publication: Time-optimal control in a single machine problem with resource constraints