Time-optimal control in a single machine problem with resource constraints

From MaRDI portal
Revision as of 00:58, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1086143

DOI10.1016/0005-1098(86)90014-2zbMath0608.90044OpenAlexW1987971040MaRDI QIDQ1086143

Adam Janiak

Publication date: 1986

Published in: Automatica (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0005-1098(86)90014-2




Related Items (31)

Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumptionJob-shop scheduling with convex models of operationsA survey of scheduling with controllable processing timesSingle machine scheduling problems with resource dependent release timesSingle machine scheduling problem with controllable processing times and resource dependent release timesSingle machine batch scheduling with deadlines and resource dependent processing timesSingle-machine scheduling with time-and-resource-dependent processing timesGeneral flow-shop scheduling with resource constraintsScheduling with controllable release dates and processing times: Makespan minimizationScheduling with controllable release dates and processing times: total completion time minimizationA bicriteria approach to minimize the total weighted number of tardy jobs with convex controllable processing times and assignable due datesSingle machine scheduling with a variable common due date and resource-dependent processing times.Single machine batch scheduling with jointly compressible setup and processing times.Considerations of single-machine scheduling with deteriorating jobsA multi-objective approach to resource allocation in single machine schedulingSingle machine scheduling problem with a common deadline and resource dependent release datesSingle-machine scheduling problems with an aging effectMakespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithmsA note on single-machine scheduling with decreasing time-dependent job processing timesSingle machine scheduling problems with deteriorating jobsSingle machine scheduling with resource dependent release times and processing timesSingle machine group scheduling with resource dependent setup and processing timesScheduling two agents with controllable processing timesGroup scheduling with controllable setup and processing times: minimizing total weighted completion timeSCHEDULING WITH DISCRETELY COMPRESSIBLE RELEASE DATES TO MINIMIZE MAKESPANComplexity analysis of an assignment problem with controllable assignment costs and its applications in schedulingSingle machine batch scheduling with resource dependent setup and processing timesMinimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problemOn minimizing resource consumption with constraints on the makespan and the total completion timeMinimization of the makespan in a two-machine problem under given resource constraintsSingle machine earliness-tardiness scheduling with resource-dependent release dates




Cites Work




This page was built for publication: Time-optimal control in a single machine problem with resource constraints