Using fuzzy set theory in a scheduling problem: A case study
From MaRDI portal
Publication:1256391
DOI10.1016/0165-0114(79)90022-8zbMath0403.90036OpenAlexW2078830462MaRDI QIDQ1256391
Publication date: 1979
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0165-0114(79)90022-8
Related Items (35)
Project scheduling problem with mixed uncertainty of randomness and fuzziness ⋮ Parallel machine scheduling models with fuzzy processing times ⋮ Developing a heuristic algorithm for order production planning using network models under uncertainty conditions ⋮ Chance-constrained model for uncertain job shop scheduling problem ⋮ Application of fuzzy distributions on project management ⋮ Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling ⋮ Solving project scheduling problem with the philosophy of fuzzy random programming ⋮ FUN: a dynamic method for scheduling problems ⋮ A heuristic method for RCPSP with fuzzy activity times ⋮ Optimization with uncertainties: a scheduling example ⋮ Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework ⋮ Criticality analysis of activity networks under interval uncertainty ⋮ A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project ⋮ Job sequencing with fuzzy processing times ⋮ Generalized path-finding algorithms on semirings and the fuzzy shortest path problem. ⋮ Fuzzy project scheduling problem and its hybrid intelligent algorithm ⋮ A cooperative co-evolutionary particle swarm optimiser based on a niche sharing scheme for the flow shop scheduling problem under uncertainty ⋮ New fuzzy models for time-cost trade-off problem ⋮ On computing the latest starting times and floats of activities in a network with imprecise durations ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ Critical path analysis in the network with fuzzy activity times ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ The computational complexity of the criticality problems in a network with interval activity times ⋮ Maximum and minimum between fuzzy symbols in non-interactive and weakly non-interactive situations ⋮ Survey on fuzzy shop scheduling ⋮ A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network ⋮ Parallel Tabu Search Algorithm with Uncertain Data for the Flexible Job Shop Problem ⋮ Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty ⋮ Scheduling arrivals to a production system in a fuzzy environment ⋮ A fuzzy-linguistic approach to a multi-criteria sequencing problem ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags ⋮ Using fuzzy sets in operational research ⋮ Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge ⋮ Fuzzy temporal characteristics of operations for project management on the network models basis ⋮ On latest starting times and floats in activity networks with ill-known durations
Cites Work
This page was built for publication: Using fuzzy set theory in a scheduling problem: A case study