Heuristics for scheduling resource-constrained projects in MPM networks
From MaRDI portal
Publication:1331566
DOI10.1016/0377-2217(94)90016-7zbMath0806.90070OpenAlexW2095273740MaRDI QIDQ1331566
Publication date: 19 February 1995
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)90016-7
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (9)
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production ⋮ Resource-constrained project scheduling: A survey of recent developments. ⋮ A hybrid framework for over-constrained generalized resource-constrained project scheduling problems ⋮ Local search algorithms for a single-machine scheduling problem with positive and negative time-lags ⋮ Resource-constrained project scheduling: Notation, classification, models, and methods ⋮ The multi-mode resource-constrained project scheduling problem with generalized precedence relations ⋮ An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations ⋮ A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags ⋮ A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
This page was built for publication: Heuristics for scheduling resource-constrained projects in MPM networks