Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs

From MaRDI portal
Revision as of 07:58, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1781573

DOI10.1016/j.cor.2004.04.012zbMath1071.90529OpenAlexW1987126439MaRDI QIDQ1781573

Rakesh Nagi, Satyaki Ghosh Dastidar

Publication date: 27 June 2005

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2004.04.012




Related Items (15)

Simultaneous lotsizing and scheduling problems: a classification and review of modelsBranch-and-price approach for robust parallel machine scheduling with sequence-dependent setup timesMulti-product valid inequalities for the discrete lot-sizing and scheduling problemScheduling wine bottling operations with multiple lines and sequence-dependent set-up times: robust formulation and a decomposition solution approachIntegrated cost optimization in a two-stage, automotive supply chainA heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection productionRelax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industryModel and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisionsSimultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classificationA two-stage solution approach for plastic injection machines scheduling problemA capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection mouldingNew formulation for the high multiplicity asymmetric traveling salesman problem with application to the Chesapeake problemAn evaluation of semidefinite programming based approaches for discrete lot-sizing problemsDiscrete lot sizing and scheduling using product decomposition into attributesA decomposition approach for the general lotsizing and scheduling problem for parallel production lines



Cites Work


This page was built for publication: Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs