Allocation of partially renewable resources: Concept, capabilities, and applications
From MaRDI portal
Publication:2709887
DOI<link itemprop=identifier href="https://doi.org/10.1002/1097-0037(200101)37:1<21::AID-NET3>3.0.CO;2-W" /><21::AID-NET3>3.0.CO;2-W 10.1002/1097-0037(200101)37:1<21::AID-NET3>3.0.CO;2-WzbMath0997.90036OpenAlexW2090103667MaRDI QIDQ2709887
Andreas Schirmer, Andreas Drexl
Publication date: 18 November 2002
Full work available at URL: https://doi.org/10.1002/1097-0037(200101)37:1<21::aid-net3>3.0.co;2-w
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (6)
A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints ⋮ A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement ⋮ Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Resource-constrained project scheduling: Notation, classification, models, and methods ⋮ Modeling and solving a bi-objective airport slot scheduling problem
Cites Work
- Scheduling subject to resource constraints: Classification and complexity
- An intelligent interactive project management support system
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Introduction to Operations Research
- The course scheduling problem at Lufthansa technical training
- Solving the resource constrained project scheduling problem with optimization subroutine library
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)
- Project Scheduling Under Partially Renewable Resource Constraints
- Critical-Path Planning and Scheduling: Mathematical Basis
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Constructing Good Solutions for the Spanish School Timetabling Problem
This page was built for publication: Allocation of partially renewable resources: Concept, capabilities, and applications