Project scheduling: The effects of problem structure on heuristic performance

From MaRDI portal
Revision as of 06:19, 6 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4090103

DOI10.1002/nav.3800230110zbMath0325.90027OpenAlexW1965722553MaRDI QIDQ4090103

James H. Patterson

Publication date: 1976

Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.3800230110




Related Items (30)

Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristicsHierarchical models for multi-project planning and schedulingA scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flowsA classification of predictive-reactive project scheduling proceduresAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsExperimental investigation of heuristics for resource-constrained project scheduling: an updateGoing to the core of hard resource-constrained project scheduling instancesKnowledge integration using problem spaces: A study in resource-constrained project schedulingAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesA prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problemA data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problemOn the measurement of complexity in activity networksUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemNew resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithmsResource-constrained project scheduling: A survey of recent developments.An evaluation of the adequacy of project network generators with systematically sampled networksA heuristic procedure for solving the dynamic probabilistic project expediting problemCapital- and resource-constrained project scheduling with net present value optimizationA random generator of resource-constrained multi-project network problemsResource-constrained project scheduling with activity splitting and setup timesA constraint-based perspective in resource constrained project schedulingA hybrid framework for over-constrained generalized resource-constrained project scheduling problemsSome efficient multi-heuristic procedures for resource-constrained project schedulingResource-constrained project scheduling: Notation, classification, models, and methodsSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationA framework for an interactive project scheduling system under limited resourcesOn the use of the complexity index as a measure of complexity in activity networksHeuristic methods and applications: A categorized surveyThe resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure




This page was built for publication: Project scheduling: The effects of problem structure on heuristic performance