Resource optimal control in some single-machine scheduling problems

From MaRDI portal
Revision as of 19:34, 6 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4302757

DOI10.1109/9.293187zbMath0816.90080OpenAlexW2162571570MaRDI QIDQ4302757

Adam Janiak, Cheng, T. C. Edwin

Publication date: 21 August 1994

Published in: IEEE Transactions on Automatic Control (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1109/9.293187




Related Items (26)

Single machine scheduling problems with controllable processing times and total absolute differences penaltiesSingle machine scheduling problems with resource dependent release timesSingle machine scheduling problem with controllable processing times and resource dependent release timesPre-emptive scheduling problems with controllable processing timesSingle machine batch scheduling with deadlines and resource dependent processing timesSingle-machine past-sequence-dependent setup times scheduling with resource allocation and learning effectSingle-machine scheduling with time-and-resource-dependent processing timesScheduling with controllable release dates and processing times: Makespan minimizationScheduling with controllable release dates and processing times: total completion time minimizationConsiderations of single-machine scheduling with deteriorating jobsSingle-machine group scheduling with deteriorating jobs and allotted resourceA note on two-agent scheduling with resource dependent release times on a single machineSingle‐machine scheduling problem with resource dependent release dates to minimise total resource‐consumptionSingle-machine scheduling problems with an aging effectSCHEDULING JOBS WITH PROCESSING TIMES DEPENDENT ON POSITION, STARTING TIME, AND ALLOTTED RESOURCEA note on single-machine scheduling with decreasing time-dependent job processing timesSingle machine scheduling problems with deteriorating jobsSingle machine scheduling with common due date and controllable processing timesSingle machine scheduling with resource dependent release times and processing timesSingle machine group scheduling with resource dependent setup and processing timesScheduling two agents with controllable processing timesGroup scheduling with controllable setup and processing times: minimizing total weighted completion timeSCHEDULING WITH DISCRETELY COMPRESSIBLE RELEASE DATES TO MINIMIZE MAKESPANSingle machine common flow allowance scheduling with controllable processing timesSingle machine batch scheduling with resource dependent setup and processing timesOn minimizing resource consumption with constraints on the makespan and the total completion time







This page was built for publication: Resource optimal control in some single-machine scheduling problems