Time optimal control of overhead cranes with hoisting of the load
From MaRDI portal
Publication:1088960
DOI10.1016/0005-1098(87)90073-2zbMath0617.93040OpenAlexW2080156142MaRDI QIDQ1088960
Publication date: 1987
Published in: Automatica (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0005-1098(87)90073-2
constraintsPontryagin maximum principleoverhead craneload hoistingship unloaderstime optimal solutions
Application models in control theory (93C95) Control of mechanical systems (70Q05) Control/observation systems governed by ordinary differential equations (93C15) Optimality conditions for problems involving ordinary differential equations (49K15)
Related Items
Robust Control Schemes for an Overhead Crane, Load Transfer Control for a Gantry Crane with Arbitrary Delay Constraints, Gain Scheduling Feedback Control for Tower Cranes, Minimum-time control of a crane with simultaneous traverse and hoisting motions, Applied soft computing for optimum design of structures, Mechanical structure optimization in minimum-time motion control of flexible bodies, Autonomous Overhead Crane System Using a Fuzzy Logic Controller, Heavy tools manipulation by low powered direct-drive five-bar parallel robot, Evolutionary optimization of interval mathematics-based design of a TSK fuzzy controller for anti-sway crane control, Detection of integrity loss in networked control systems using an interval finite memory observer, Stable adaptive compensation with fuzzy CMAC for an overhead crane, Digital Filter Based Motion Command Preconditioning of Time Varying Suspended Loads in Boom Cranes for Sway Suppression, Minimum-time anti-swing motion planning of cranes using linear programming, Second-order sliding-mode control of container cranes
Cites Work