Product development resource allocation with foresight
From MaRDI portal
Publication:1887867
DOI10.1016/j.ejor.2003.06.021zbMath1067.90078OpenAlexW2168829424MaRDI QIDQ1887867
David N. Ford, Nitin R. Joglekar
Publication date: 22 November 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.06.021
Resource allocationControl theoryProduct developmentProject management and schedulingSystem dynamicsConcurrent developmentRework cycle
Related Items (5)
Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm ⋮ A dynamic model for managing overlapped iterative product development ⋮ Optimal testing strategies in overlapped design process ⋮ Overlapping and communication policies in product development ⋮ Optimal overlapping and functional interaction in product development
Uses Software
Cites Work
- The Nonstationary Staff-Planning Problem with Business Cycle and Learning Effects
- System dynamics in project management: assessing the impacts of client behaviour on project performance
- A Tactical Planning Model for a Job Shop
- A Predictive Model of Sequential Iteration in Engineering Design
- Planning Information Technology–Knowledge Worker Systems
- A Model-Based Framework to Overlap Product Development Activities
- Identifying Controlling Features of Engineering Design Iteration
This page was built for publication: Product development resource allocation with foresight