A Network Flow Computation for Project Cost Curves

From MaRDI portal
Publication:2769012

DOI10.1287/mnsc.7.2.167zbMath0995.90519OpenAlexW2052423850MaRDI QIDQ2769012

D. R. Fulkerson

Publication date: 22 October 2002

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.7.2.167




Related Items (54)

The construction of stable project baseline schedulesResource allocation via dynamic programming in activity networksPERT and crashing revisited: Mathematical generalizationsThe discrete time/cost trade-off problem: Extensions and heuristic proceduresScheduling project activities in a distributed environmentA network flow algorithm for just-in-time project schedulingComplexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobsA float-path theory and its application to the time-cost tradeoff problemMin-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered JobsA continuous time-cost tradeoff problem with multiple milestones and completely ordered jobsA reduction tree approach for the discrete time/cost trade-off problemResource allocation in multi-class dynamic PERT networks with finite capacityA solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter searchOptimal crashing of an activity network with disruptionsImproving electromagnetism algorithm for solving resource allocation problem in stochastic networksAn adaptive crashing policy for stochastic time-cost tradeoff problemsMulti-objective time-cost trade-off in dynamic PERT networks using an interactive approachThe discrete time-cost tradeoff problem revisitedActivity nets: A guided tour through some recent developmentsMulti-resource allocation in stochastic project schedulingCPM-Cost: Ein parametrischer DekompositionsalgorithmusA linear time-cost tradeoff problem with multiple milestones under a comb graphScheduling two projects with controllable processing times in a single-machine environmentA multi-objective resource allocation problem in dynamic PERT networksA heuristic procedure for solving the dynamic probabilistic project expediting problemTime-cost trade-off via optimal control theory in Markov PERT networksThe risk element transmission theory research of multi-objective risk-time-cost trade-offStructuring product development processesA multi-objective resource allocation problem in PERT networksAn application of randomized minimum cut to the project time/cost tradeoff problemUnnamed ItemExperimental evaluation of simulated annealing algorithms for the time-cost trade-off problemNetwork decomposition-based benchmark results for the discrete time-cost tradeoff problemNew computational results for the discrete time/cost trade-off problem with time-switch constraintsOn project scheduling with irregular starting time costsRobust resource allocations in temporal networksDie Berücksichtigung von Festterminrestriktionen bei der Projektplanung und -steuerungPdm time cost trade-off:activities are splittable or non-splittableKapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)A new approach based on the surrogating method in the project time compression problemsA Decomposition Algorithm for Nested Resource Allocation ProblemsStochastic gradient-based time-cost tradeoffs in PERT networks using simulationResource-constrained project scheduling: Notation, classification, models, and methodsA New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project NetworkProject management with time, cost, and quality considerationsHierarchical approach to project planning: The case of a petroleum pipeline constructionUnnamed ItemThe Bi-Criterial Approach to Project Cost and Schedule Buffers SizingThe resource constrained project scheduling problem with multiple crashable modes: A heuristic procedureA parametric algorithm for convex cost network flow and related problemsA network flow procedure for project crashing with penalty nodesA genetic algorithm approach for the time-cost trade-off in PERT networksManaging risk-adjusted resource allocation for project time-cost tradeoffsA Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph




This page was built for publication: A Network Flow Computation for Project Cost Curves