Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case

From MaRDI portal
Revision as of 16:19, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:864823


DOI10.1016/j.amc.2006.05.106zbMath1127.90348MaRDI QIDQ864823

N. E. Zubov

Publication date: 13 February 2007

Published in: Applied Mathematics and Computation (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.amc.2006.05.106


90B35: Deterministic scheduling theory in operations research

90C59: Approximation methods and heuristics in mathematical programming


Related Items



Cites Work