A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex

From MaRDI portal
Revision as of 02:37, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1577763

DOI10.1016/S0377-2217(99)00380-XzbMath1025.90523MaRDI QIDQ1577763

Zihou Yang, Lixin Tang, Jiyin Liu, Aiying Rong

Publication date: 24 November 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items

Efficient preprocessing methods for tabu search: an application on asymmetric travelling salesman problem, Hybrid search with neighborhood reduction for the multiple traveling salesman problem, An effective iterated two-stage heuristic algorithm for the multiple traveling salesmen problem, A threshold accepting heuristic with intense local search for the solution of special instances of the traveling salesman problem, Minimization of the total traveling distance and maximum distance by using a transformed-based encoding EDA to solve the multiple traveling salesmen problem, Modeling and optimization of multiple traveling salesmen problems: an evolution strategy approach, A GROUPING GENETIC ALGORITHM FOR THE MULTIPLE TRAVELING SALESPERSON PROBLEM, Minimax persistent monitoring of a network system, A hybrid flowshop scheduling problem for a cold treating process in seamless steel tube production, A new approach to solving the multiple traveling salesperson problem using genetic algorithms, Experimental study of a hybrid genetic algorithm for the multiple travelling salesman problem, Production scheduling optimization algorithm for the hot rolling processes, Scheduling continuous aluminium casting lines, Lot sizing and furnace scheduling in small foundries, A multi-objective hot-rolling scheduling problem in the compact strip production, Scheduling in a continuous galvanizing line, A finite-capacity production scheduling procedure for a Belgian steel company, Modeling and application for rolling scheduling problem based on TSP, Integrated problem of soaking pit heating and hot rolling scheduling in steel plants, Development of hybrid evolutionary algorithms for production scheduling of hot strip mill, Multiperiod multi traveling salesmen problem considering time window constraints with an application to a real world case, The multiagent planning problem, An efficient optimal solution to the coil sequencing problem in electro-galvanizing line, A review of planning and scheduling systems and methods for integrated steel production, Integer linear programming formulations of multiple salesman problems and its variations, A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production, Simultaneously scheduling multiple turns for steel color-coating production, New Imperialist Competitive Algorithm to solve the travelling salesman problem, A new crossover approach for solving the multiple travelling salesmen problem using genetic algorithms



Cites Work