Modeling and solving rich quay crane scheduling problems
From MaRDI portal
Publication:1761126
DOI10.1016/j.cor.2011.09.025zbMath1251.90163OpenAlexW1968811477MaRDI QIDQ1761126
Frank Meisel, Roberto Trunfio, Pasquale Legato
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2011.09.025
Related Items
Some complexity results and an efficient algorithm for quay crane scheduling problem, A follow-up survey of berth allocation and quay crane scheduling problems in container terminals, Scheduling multiple factory cranes on a common track, A reclaimer scheduling problem arising in coal stockyard management, Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level, An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes, Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel, Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity, A generalized classification scheme for crane scheduling with interference, Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model, Scheduling reclaimers serving a stock pad at a coal terminal, Scheduling quay cranes and yard trucks for unloading operations in container ports, A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints, The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion, An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem, An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability, Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading, A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules, Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles, Double girder bridge crane with double cycling: scheduling strategy and performance evaluation
Cites Work
- Unnamed Item
- A tabu search heuristic for the quay crane scheduling problem
- Simulation-based optimization for discharge/loading operations at a maritime container terminal
- A survey of berth allocation and quay crane scheduling problems in container terminals
- Exact and approximation algorithms for makespan minimization on unrelated parallel machines
- Container terminal operation and operations research -- a classification and literature review
- A crane scheduling method for port container terminals
- A fast heuristic for quay crane scheduling with interference constraints
- Operations research at container terminals: a literature update
- The quay crane scheduling problem with time windows
- Crane scheduling with spatial constraints
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
- Crane scheduling with non-crossing constraint
- Duality-Based Algorithms for Scheduling Unrelated Parallel Machines
- A m‐parallel crane scheduling problem with a non‐crossing constraint