Yuan-Shyi Peter Chiu

From MaRDI portal
Revision as of 12:58, 7 October 2023 by Import231006081045 (talk | contribs) (Created automatically from import231006081045)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:409869

Available identifiers

zbMath Open chiu.yuanshyi-peterMaRDI QIDQ409869

List of research outcomes





PublicationDate of PublicationType
ON MATHEMATICAL MODELING OF A MULTI-PRODUCT EMQ MODEL WITH AN ENHANCED END ITEMS ISSUING POLICY AND FAILURES IN REWORK2018-01-24Paper
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments2012-10-17Paper
Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period2012-05-30Paper
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments2012-04-15Paper
Solving fi nite production rate model with scrap and multiple deliveries2011-08-04Paper
Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance2011-02-03Paper
The effect of service level constraint on EPQ model with random defective rate2010-12-01Paper
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework2010-09-01Paper
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown2010-06-28Paper
A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns2009-11-16Paper
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging2009-07-17Paper
Solving an EPQ model with rework and service level constraint2007-10-26Paper
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns2007-03-08Paper
Numerical method for determination of reworking or scraping the defective items in a finite production rate model2006-05-23Paper
A modification of the least unit cost lot-sizing heuristic2005-01-31Paper
Materials procurement decision-making based on the economic order quantity model and the economic production quantity model2005-01-11Paper
A finite production model with random defective rate and shortages allowed and backordered2004-06-14Paper
An economic production quantity model with the rework process of repairable defective items2004-06-14Paper

Research outcomes over time

This page was built for person: Yuan-Shyi Peter Chiu