| Publication | Date of Publication | Type |
|---|
| A stochastic integer programming approach to reserve staff scheduling with preferences | 2024-09-24 | Paper |
| An improved column-generation-based matheuristic for learning classification trees | 2024-06-25 | Paper |
| A parallel ruin and recreate heuristic for personnel scheduling in a flexible working environment | 2024-05-30 | Paper |
| Learning to repeatedly solve routing problems | 2024-03-15 | Paper |
| Selective arc‐ng pricing for vehicle routing | 2023-11-23 | Paper |
| Routing electric vehicles with a single recharge per route | 2023-11-23 | Paper |
| Assigning Team Tasks and Multiple Activities to Fixed Work Shifts | 2023-05-09 | Paper |
| Valid Inequalities and Separation Algorithms for the Set Partitioning Problem | 2023-05-09 | Paper |
| Clique Inequalities Applied to the Vehicle Routing Problem with Time Windows | 2023-05-09 | Paper |
| A stochastic integer programming approach to reserve staff scheduling with preferences | 2022-10-10 | Paper |
| Integral Column Generation for Set Partitioning Problems with Side Constraints | 2022-09-19 | Paper |
| Stabilized Column Generation Via the Dynamic Separation of Aggregated Rows | 2022-06-30 | Paper |
| Exact Branch-Price-and-Cut for a Hospital Therapist Scheduling Problem with Flexible Service Locations and Time-Dependent Location Capacity | 2022-06-30 | Paper |
| Branch-and-cut-and-price for the electric vehicle routing problem with time windows, piecewise-linear recharging and capacitated recharging stations | 2022-06-22 | Paper |
| An improved formulation for the inventory routing problem with time-varying demands | 2022-06-08 | Paper |
| Deep-learning-based partial pricing in a branch-and-price algorithm for personalized crew rostering | 2022-03-09 | Paper |
| The joint network vehicle routing game with optional customers | 2022-03-07 | Paper |
| The fragility-constrained vehicle routing problem with time windows | 2021-09-04 | Paper |
| Addressing Orientation Symmetry in the Time Window Assignment Vehicle Routing Problem | 2021-06-23 | Paper |
| Branch-Price-and-Cut Algorithms for the Vehicle Routing Problem with Stochastic and Correlated Travel Times | 2021-06-17 | Paper |
| Real-time bi-objective personnel re-scheduling in the retail industry | 2021-06-07 | Paper |
| Accelerating Benders decomposition for short-term hydropower maintenance scheduling | 2021-06-03 | Paper |
| Real-time personnel re-scheduling after a minor disruption in the retail industry | 2021-04-20 | Paper |
| The inventory routing problem with demand moves | 2021-02-08 | Paper |
| Dynamic constraint aggregation for solving very large-scale airline crew pairing problems | 2021-02-08 | Paper |
| A decomposition-based heuristic for large employee scheduling problems with inter-department transfers | 2020-04-29 | Paper |
| A branch-and-price heuristic for the crew pairing problem with language constraints | 2020-02-11 | Paper |
| Daily course pattern formulation and valid inequalities for the curriculum-based course timetabling problem | 2020-01-03 | Paper |
| A two-stage solution approach for personalized multi-department multi-day shift scheduling | 2019-10-15 | Paper |
| Linear fractional approximations for master problems in column generation | 2019-02-22 | Paper |
| Column generation for vehicle routing problems with multiple synchronization constraints | 2018-10-30 | Paper |
| The pickup and delivery problem with time windows and handling operations | 2018-07-11 | Paper |
| A new heuristic branching scheme for the crew pairing problem with base constraints | 2018-07-11 | Paper |
| Two decomposition algorithms for solving a minimum weight maximum clique model for the air conflict resolution problem | 2018-05-24 | Paper |
| New Enhancements for the Exact Solution of the Vehicle Routing Problem with Time Windows | 2017-12-29 | Paper |
| The daily tail assignment problem under operational uncertainty using look-ahead maintenance constraints | 2017-11-23 | Paper |
| A New Variant of the Minimum-Weight Maximum-Cardinality Clique Problem to Solve Conflicts between Aircraft | 2017-09-12 | Paper |
| Creating annual delivery programs of liquefied natural gas | 2017-06-21 | Paper |
| Exact Algorithms for Electric Vehicle-Routing Problems with Time Windows | 2017-01-26 | Paper |
| A branch-price-and-cut algorithm for the workover rig routing problem | 2016-11-11 | Paper |
| A branch-price-and-cut method for a ship routing and scheduling problem with split loads | 2016-11-11 | Paper |
| A branch-cut-and-price algorithm for the vehicle routing problem with stochastic demands | 2016-11-10 | Paper |
| Recoverable robust single day aircraft maintenance routing problem | 2016-11-10 | Paper |
| A population-based metaheuristic for the pickup and delivery problem with time windows and LIFO loading | 2016-11-10 | Paper |
| A priori optimization with recourse for the vehicle routing problem with hard time windows and stochastic service times | 2016-10-07 | Paper |
| Branch-price-and-cut algorithms for the pickup and delivery problem with time windows and multiple stacks | 2016-10-07 | Paper |
| The discrete time window assignment vehicle routing problem | 2016-10-06 | Paper |
| A branch-price-and-cut algorithm for the min-max \(k\)-vehicle windy rural postman problem | 2016-06-10 | Paper |
| Separating valid odd-cycle and odd-set inequalities for the multiple depot vehicle scheduling problem | 2014-09-30 | Paper |
| A two-phase mathematical-programming heuristic for flexible assignment of activities and tasks to work shifts | 2014-08-18 | Paper |
| Stabilized dynamic constraint aggregation for solving set partitioning problems | 2014-07-27 | Paper |
| An improved primal simplex algorithm for degenerate linear programs | 2012-07-28 | Paper |
| Path-reduced costs for eliminating arcs in routing and scheduling | 2012-07-28 | Paper |
| Integrated airline crew scheduling: a bi-dynamic constraint aggregation method using neighborhoods | 2012-05-14 | Paper |
| Cutting planes for branch-and-price algorithms | 2012-01-18 | Paper |
| Branch-and-Price-and-Cut for the Split-Delivery Vehicle Routing Problem with Time Windows | 2011-11-24 | Paper |
| A branch-and-price-based large neighborhood search algorithm for the vehicle routing problem with time windows | 2010-11-24 | Paper |
| A branch-and-price algorithm for the vehicle routing problem with deliveries, selective pickups and time windows | 2010-06-11 | Paper |
| Multi-phase dynamic constraint aggregation for set partitioning type problems | 2010-04-15 | Paper |
| Lower bounds and a tabu search algorithm for the minimum deficiency problem | 2009-09-18 | Paper |
| A comparison of five heuristics for the multiple depot vehicle scheduling problem | 2009-08-28 | Paper |
| Dynamic Aggregation of Set-Partitioning Constraints in Column Generation | 2009-07-18 | Paper |
| Bi-dynamic constraint aggregation and subproblem reduction | 2007-11-06 | Paper |
| Parking buses in a depot with stochastic arrival times | 2007-07-04 | Paper |
| Parking buses in a depot using block patterns: a Benders decomposition approach for minimizing type mismatches | 2007-06-04 | Paper |
| Managing large fixed costs in vehicle routing and crew scheduling problems solved by column generation | 2006-12-07 | Paper |
| Periodic airline fleet assignment with time windows, spacing constraints, and time dependent revenues | 2006-10-27 | Paper |
| Shortest Path Problems with Resource Constraints | 2006-10-16 | Paper |
| The shortest path problem with forbidden paths | 2005-08-01 | Paper |
| The shortest path problem with forbidden paths | 2005-05-12 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4532231 | 2002-09-04 | Paper |
| The shortest path problem with time windows and linear waiting costs | 2002-09-02 | Paper |
| Accelerating strategies in column generation methods for vehicle routing and crew scheduling problems | 2002-07-08 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4532229 | 2002-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4955266 | 2001-08-20 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4955271 | 2001-07-23 | Paper |
| Simultaneous Vehicle and Crew Scheduling in Urban Mass Transit Systems | 2001-01-01 | Paper |
| Multi-depot vehicle scheduling problems with time windows and waiting costs | 2000-06-14 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4699369 | 2000-02-01 | Paper |
| Crew pairing at Air France | 1999-02-22 | Paper |
| Daily Aircraft Routing and Scheduling | 1998-06-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4294142 | 1994-07-04 | Paper |