Chelliah Skriskandarajah

From MaRDI portal
Revision as of 03:58, 12 December 2023 by AuthorDisambiguator (talk | contribs) (AuthorDisambiguator moved page Chelliah Skriskandarajah to Chelliah Skriskandarajah: Duplicate)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:1079485

Available identifiers

zbMath Open sriskandarajah.chelliahMaRDI QIDQ1079485

List of research outcomes

PublicationDate of PublicationType
Efficient algorithms for flexible job shop scheduling with parallel machines2023-10-09Paper
Sustainability Planning for Healthcare Information Exchanges with Supplier Rebate Program2020-11-04Paper
Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics2017-03-03Paper
Structural Search and Optimization in Social Networks2016-06-29Paper
Coordination in a two-stage production system: complexity, conflict and cooperation2012-11-15Paper
Balancing perfectly periodic service schedules: An application from recycling and waste management2012-10-15Paper
The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan2012-07-28Paper
A Traffic-Grooming Algorithm for Wavelength-Routed Optical Networks2012-06-18Paper
Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-Cell Manufacturing2011-11-18Paper
Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models2010-06-11Paper
Mitigating the risk of supply disruptions: a case study2009-09-13Paper
Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot2009-07-10Paper
Supply chain scheduling: Just-in-time environment2008-09-03Paper
Robotic cells with parallel machines: throughput maximization in constant travel-time cells2007-12-20Paper
Throughput optimization in robotic cells2007-07-13Paper
Scheduling web advertisements: a note on the minspace problem2007-05-15Paper
Sequencing and scheduling in robotic cells: recent developments2007-05-15Paper
A note on productivity gains in flexible robotic cells2006-11-17Paper
Scheduling advertisements on a web page to maximize revenue2006-08-04Paper
Scheduling dual gripper robotic cell: one-unit cycles2006-03-16Paper
A review of TSP based approaches for flowshop scheduling2005-11-04Paper
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups2005-09-28Paper
Scheduling and lot streaming in two-machine open shops with no-wait in process2005-06-01Paper
Open shops with jobs overlap -- revisited2005-02-09Paper
Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells2005-02-09Paper
Scheduling and lot streaming in flowshops with no-wait in process2003-08-21Paper
Performance bounds of algorithms for scheduling advertisements on a web page2003-08-21Paper
Scheduling in Robotic Cells: Heuristics and Cell Design2002-08-15Paper
Operational decisions in AGV-served flowshop loops: Scheduling2002-06-09Paper
Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition2002-06-09Paper
Minimizing Cycle Time in a Blocking Flowshop2002-06-04Paper
Parallel machine scheduling with a common server2001-11-21Paper
https://portal.mardi4nfdi.de/entity/Q27414882001-10-24Paper
A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups2000-11-22Paper
Minimizing makespan in a pallet-constrained flowshop1999-10-05Paper
https://portal.mardi4nfdi.de/entity/Q42397061999-10-04Paper
One-operator-two-machine flowshop scheduling with setup and dismounting times1999-09-22Paper
Scheduling in robotic cells: Complexity and steady state analysis1999-08-02Paper
Tabu search-based heuristics for cellular manufacturing systems in the presence of alternative process plans1999-05-05Paper
Sequencing of robot activities and parts in two-machine robotic cells1999-03-01Paper
Minimizing Makespan In Flowshops With Pallet Requirements: Computational Complexity1998-09-07Paper
Design and operational issues in AGV-served manufacturing systems1998-04-02Paper
Scheduling large robotic cells without buffers1998-04-02Paper
Scheduling in Robotic Cells: Classification, Two and Three Machine Cells1997-11-25Paper
Some Applications of the Generalized Travelling Salesman Problem1997-10-30Paper
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process1997-01-07Paper
An efficient algorithm for a job shop problem1995-08-27Paper
Performance of scheduling algorithms for no-wait flowshops with parallel machines1995-01-03Paper
Open shops with jobs overlap1994-10-25Paper
On the complexity of preemptive openshop scheduling problems1994-09-15Paper
Optimal control of a class of DEDS: Flow-shops with state-dependent processing times1994-06-23Paper
The complexity of scheduling jobs in repetitive manufacturing systems1994-02-28Paper
Two-machine group scheduling problem with blocking and anticipatory setups1994-01-06Paper
Hierarchical Control Of The Two Processor Flow-Shop With State Dependent Processing Times: Complexity Analysis And Approximate Algorithms1993-11-15Paper
A Note On The Complexity Of Openshop Scheduling Problems1993-11-15Paper
The two-machine permutation flow shop with state-dependent processing times1993-08-25Paper
On the complexity of generalized due date scheduling problems1992-06-25Paper
https://portal.mardi4nfdi.de/entity/Q31976061990-01-01Paper
Scheduling algorithms for flexible flowshops: Worst and average case performance1989-01-01Paper
Scheduling methods for a class of flexible manufacturing systems1989-01-01Paper
Some no-wait shops scheduling problems: Complexity aspect1986-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Chelliah Skriskandarajah