The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times

From MaRDI portal
Revision as of 09:56, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:706984

DOI10.1016/J.COR.2003.08.014zbMath1071.90534OpenAlexW1997722319MaRDI QIDQ706984

Thorkell Magnusson, Diwakar Gupta

Publication date: 9 February 2005

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2003.08.014




Related Items (30)

Simultaneous lotsizing and scheduling problems: a classification and review of modelsNeighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setupsLead time considerations for the multi-level capacitated lot-sizing problemDynamic capacitated lot-sizing problems: a classification and review of solution approachesA Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problemDesigning new heuristics for the capacitated lot sizing problem by genetic programmingOn production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decayInfeasibility handling in genetic algorithm using nested domains for production planningThe synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical modelThe capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain networkTactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model FormulationsValid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setupsFix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutionsModeling industrial lot sizing problems: a reviewLot sizing and furnace scheduling in small foundriesA note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup timesSingle item lot-sizing problem for a warm/cold process with immediate lost salesProduction planning problem with sequence dependent setups as a bilevel programming problemA capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection mouldingProduction setup-sequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patchingNew formulation for the high multiplicity asymmetric traveling salesman problem with application to the Chesapeake problemSingle machine multi-product capacitated lot sizing with sequence-dependent setupsProfit maximization in simultaneous lot-sizing and scheduling problemDecomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuumSolving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristicUm modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantesGrouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup costCapacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-overA multi-stage stochastic programming model of lot-sizing and scheduling problems with machine eligibilities and sequence-dependent setupsShortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction




Cites Work




This page was built for publication: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times