On latest starting times and floats in activity networks with ill-known durations

From MaRDI portal
Revision as of 11:42, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1869710

DOI10.1016/S0377-2217(02)00560-XzbMath1037.90004MaRDI QIDQ1869710

Vincent Galvagnon, Hélène Fargier, Dubois, Didier

Publication date: 28 April 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (21)

Analysis of critical paths in a project network with fuzzy activity timesApplying fuzzy method for measuring criticality in project networkFast minimum float computation in activity networks under interval uncertaintyCriticality analysis of activity networks under interval uncertaintyPossibilistic bottleneck combinatorial optimization problems with ill-known weightsA fuzzy time-dependent project scheduling problemSolution of interval PERT/CPM network problems by a simplified tabular methodFuzzy reliability analysis using cellular automata for network systemsA robust lot sizing problem with ill-known demandsOn computing the latest starting times and floats of activities in a network with imprecise durationsA path enumeration approach for the analysis of critical activities in fuzzy networksFuzzy approach for production planning and detailed scheduling in paints manufacturingOn the latest starting times and criticality of activities in a network with imprecise durationsA node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project networkA New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project NetworkA simple approach to fuzzy critical path analysis in project networksMinmax regret approach and optimality evaluation in combinatorial optimization problems with interval and fuzzy weightsComputing latest starting times of activities in interval-valued networks with minimal time lagsThe robust shortest path problem in series -- parallel multidigraphs with interval dataFuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledgeFuzzy temporal characteristics of operations for project management on the network models basis




Cites Work




This page was built for publication: On latest starting times and floats in activity networks with ill-known durations