A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem
From MaRDI portal
Publication:2355885
DOI10.1016/j.ejor.2013.03.005zbMath1317.90339OpenAlexW2084446444MaRDI QIDQ2355885
Publication date: 28 July 2015
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2013.03.005
project schedulinggenetic algorithmsresource-constrainedcrossover operatorsprecedence-based permutation
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (13)
Multi-mode resource availability cost problem with recruitment and release dates for resources ⋮ Scheduling resource-constrained projects with a flexible project structure ⋮ A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling ⋮ An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case ⋮ An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem ⋮ A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times ⋮ Unnamed Item ⋮ Towards merging binary integer programming techniques with genetic algorithms ⋮ A survey of hybrid metaheuristics for the resource-constrained project scheduling problem ⋮ Fuzzy multi-objective chance-constrained programming model for hazardous materials transportation ⋮ A tree search heuristic for the resource constrained project scheduling problem with transfer times ⋮ On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems ⋮ Activities planning and resources assignment on distinct places: a mathematical model
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres
- Scheduling and constraint propagation
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- A population-based approach to the resource-constrained project scheduling problem
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Embedding learning capability in Lagrangean relaxation: an application to the travelling salesman problem
- An iterative scheduling technique for resource-constrained project scheduling
- PSPLIB -- a project scheduling problem library
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Justification and RCPSP: a technique that pays
- Proactive policies for the stochastic resource-constrained project scheduling problem
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
- A self-adapting genetic algorithm for project scheduling under resource constraints
- A competitive heuristic solution technique for resource-constrained project scheduling
- A robust genetic algorithm for resource allocation in project scheduling
This page was built for publication: A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem