Multiple and bicriteria scheduling: A literature survey

From MaRDI portal
Revision as of 03:17, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1130028

DOI10.1016/0377-2217(93)E0140-SzbMath0913.90178OpenAlexW1990848197MaRDI QIDQ1130028

Amit Nagar, Jorge Haddock, Sunderesh S. Heragu

Publication date: 1995

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(93)e0140-s




Related Items (52)

Minimizing the weighted number of tardy jobs on multiple machines: a reviewNon-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristicOn the flexibility of a decision theory-based heuristic for single machine schedulingMakespan minimization subject to flowtime optimality on identical parallel machinesA multi-criteria approach for scheduling semiconductor wafer fabrication facilitiesSingle machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs\(K\)-PPM: a new exact method to solve multi-objective combinatorial optimization problemsBi-objective resource-constrained project scheduling with robustness and makespan criteriaAn exact parallel method for a bi-objective permutation flowshop problemOn optimizing a bi-objective flowshop scheduling problem in an uncertain environmentParallel partitioning method (PPM): A new exact method to solve bi-objective problemsA heuristic approach to bicriteria schedulingA combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problemOn Lagrangian relaxation for constrained maximization and reoptimization problemsA survey of single machine scheduling to minimize weighted number of tardy jobsOn the complexity of bi-criteria scheduling on a single batch processing machineThe development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure.Bi-criteria scheduling on a single parallel-batch machineMultiobjective bed management considering emergency and elective patient flowsUnnamed ItemAnt colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problemHeuristic for a new multiobjective scheduling problemBicriterion scheduling with equal processing times on a batch processing machineOn the Integration of Theoretical Single-Objective Scheduling Results for Multi-objective ProblemsLexicographic optimization of a permutation flow shop scheduling problem with time lag constraintsA new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardinessMinimizing makespan subject to minimum flowtime on two identical parallel machinesMulticriteria scheduling problems: a surveyA parallel multiple reference point approach for multi-objective optimizationA grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardinessTwo-machine open shop scheduling with secondary criteriaMinimizing total completion time and total deviation of job completion times from a restrictive due-dateMinimizing flowtime subject to optimal makespan on two identical parallel machinesA multicriteria approach to timeout collaboration protocolSolving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industryLocal search heuristics for two-stage flow shop problems with secondary criterionBicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobsFlowshop-scheduling problems with makespan criterion: a reviewA bicriteria approach to the two-machine flow shop scheduling problemA MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNINGBICRITERIA SCHEDULING ON SINGLE-MACHINE WITH INVENTORY OPERATIONSNew solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobsGenerating efficient schedules for identical parallel machines involving flow-time and tardy jobsGenetic local search for multi-objective flowshop scheduling problemsBicriteria train scheduling for high-speed passenger railroad planning applicationsMinimizing makespan subject to minimum total flow-time on identical parallel machinesPareto and scalar bicriterion optimization in scheduling deteriorating jobsA bicriteria two-machine permutation flowshop problemEfficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisationAn ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problemScheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristicUsing genetic algorithms for single-machine bicriteria scheduling problems




Cites Work




This page was built for publication: Multiple and bicriteria scheduling: A literature survey