Ali Allahverdi

From MaRDI portal
Revision as of 21:06, 10 December 2023 by AuthorDisambiguator (talk | contribs) (AuthorDisambiguator moved page Ali Allahverdi to Ali Allahverdi: Duplicate)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:296865

Available identifiers

zbMath Open allahverdi.aliMaRDI QIDQ296865

List of research outcomes

PublicationDate of PublicationType
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times2023-10-10Paper
Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times2023-09-19Paper
Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times2021-11-12Paper
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure2021-09-10Paper
Minimizing total completion time for flowshop scheduling problem with uncertain processing times2021-07-27Paper
Algorithms for four-machine flowshop scheduling problem with uncertain processing times to minimize makespan2020-05-13Paper
Two-stage assembly scheduling problem for minimizing total tardiness with setup times2020-02-05Paper
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times2020-01-27Paper
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan2020-01-14Paper
Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness2019-01-29Paper
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times2018-10-09Paper
A survey of scheduling problems with no-wait in process2018-05-24Paper
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan2018-05-22Paper
Minimizing total tardiness in no-wait flowshops2017-04-25Paper
Single machine scheduling problem with interval processing times to minimize mean weighted completion time2016-11-10Paper
The third comprehensive survey on scheduling problems with setup times/costs2016-10-06Paper
Total completion time with makespan constraint in no-wait flowshops with setup times2016-06-23Paper
Heuristics for no-wait flowshops with makespan subject to mean completion time2014-06-27Paper
Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times2011-06-28Paper
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times2010-12-14Paper
Permutation flow shops with exact time lags to minimise maximum lateness2010-11-07Paper
New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness2010-11-07Paper
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times2010-10-25Paper
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time2010-06-28Paper
The two-stage assembly scheduling problem to minimize total completion time with setup times2009-05-19Paper
Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan2009-04-03Paper
Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness2008-12-04Paper
https://portal.mardi4nfdi.de/entity/Q35424902008-12-01Paper
https://portal.mardi4nfdi.de/entity/Q54377632008-01-28Paper
https://portal.mardi4nfdi.de/entity/Q54377652008-01-28Paper
Some effective heuristics for no-wait flowshops with setup times to minimize total completion time2008-01-25Paper
The significance of reducing setup times/setup costs2008-01-21Paper
Batching deteriorating items with applications in computer communication and reverse logistics2007-06-13Paper
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times2007-05-11Paper
https://portal.mardi4nfdi.de/entity/Q34366022007-05-11Paper
Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm2007-03-21Paper
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times2007-03-21Paper
Using mixed graph coloring to minimize total completion time in job shop scheduling2007-01-11Paper
Scheduling multi-stage parallel-processor services to minimize average response time2006-02-13Paper
Using a hybrid evolutionary algorithm to minimize variance in response time for multimedia object requests2006-01-17Paper
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times2005-11-04Paper
A PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application2005-11-01Paper
Flowshop scheduling problem to minimize total completion time with random and bounded processing times2005-04-04Paper
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times2005-03-16Paper
No-wait flowshops with bicriteria of makespan and total completion time2005-03-14Paper
A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness2005-02-23Paper
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime2005-01-31Paper
Job lateness in flowshops with setup and removal times separated2005-01-19Paper
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times2003-12-03Paper
New heuristics for no-wait flowshops to minimize makespan.2003-11-17Paper
No-wait flowshops with bicriteria of makespan and maximum lateness.2003-10-14Paper
Total flowtime in no-wait flowshops with separated setup times.2003-09-07Paper
Two-machine flowshop minimum-length scheduling problem with random and bounded processing times2003-06-23Paper
The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime2003-04-28Paper
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications2002-05-14Paper
The Tricriteria Two-Machine Flowshop Scheduling Problem2002-01-30Paper
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times2000-09-26Paper
Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function1999-12-20Paper
Stochastically minimizing total flowtime in flowshops with no waiting space1999-11-08Paper
Scheduling in stochastic flowshops with independent setup, processing and removal times1997-09-17Paper
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness1997-01-06Paper
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns1995-11-09Paper
Two-machine ordered flowshop scheduling under random breakdowns1995-01-11Paper
https://portal.mardi4nfdi.de/entity/Q43062731994-09-19Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Ali Allahverdi