Publication | Date of Publication | Type |
---|
New Lower Bound and Exact Method for the Continuous Berth Allocation Problem | 2020-10-12 | Paper |
A mathematical formulation and efficient heuristics for the dynamic container relocation problem | 2019-05-02 | Paper |
The loss‐averse newsvendor problem with supply options | 2019-05-02 | Paper |
A carrier-shipper contract under asymmetric information in the ocean transport industry | 2019-03-06 | Paper |
Coordinated pricing and inventory control problems with capacity constraints and fixed ordering cost | 2019-03-05 | Paper |
Appointment sequencing: why the smallest-variance-first rule may not be optimal | 2018-05-24 | Paper |
Carrier Portfolio Management for Shipping Seasonal Products | 2017-12-15 | Paper |
Inventory competition with yield reliability improvement | 2015-05-06 | Paper |
Compensation plan for competing salespersons under asymmetric information | 2014-07-27 | Paper |
Economic lot sizing: the capacity reservation model | 2014-05-15 | Paper |
Scheduling Arrivals to a Stochastic Service Delivery System Using Copositive Cones | 2013-09-05 | Paper |
Approximation methods for the analysis of a multicomponent, multiproduct assemble-to-order system | 2012-06-18 | Paper |
Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing | 2012-02-21 | Paper |
A Dynamic Lot-Sizing Model with Demand Time Windows | 2012-02-19 | Paper |
Stock Replenishment and Shipment Scheduling for Vendor-Managed Inventory Systems | 2012-02-12 | Paper |
TECHNICAL NOTE—Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes | 2011-11-18 | Paper |
Capacitated dynamic lot-sizing problem with delivery/production time windows | 2010-12-20 | Paper |
Parallel machine scheduling with multiple unloading servers | 2010-07-24 | Paper |
Vehicle scheduling with combinable delivery and pickup operations | 2009-12-07 | Paper |
Inventory control problem with freight cost and stochastic demand | 2009-12-07 | Paper |
Optimal transportation policies for production/inventory systems with an unreliable and a reliable carrier | 2009-09-01 | Paper |
Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity | 2009-08-13 | Paper |
A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse | 2009-07-09 | Paper |
Optimization of processing and delivery decisions involving third-party machines | 2009-02-04 | Paper |
Minimizing the makespan in a two-machine cross-docking flow shop problem | 2009-01-22 | Paper |
Managing components for assemble-to-order products with lead-time-dependent pricing: The full-shipment model | 2008-09-12 | Paper |
Logistics scheduling with batching and transportation | 2008-04-24 | Paper |
Preemptive multiprocessor order scheduling to minimize total weighted flowtime | 2008-04-24 | Paper |
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions | 2008-01-21 | Paper |
Three is easy, two is hard: Open shop sum-batch scheduling problem refined | 2008-01-15 | Paper |
Parallel-machine scheduling under potential disruption | 2008-01-04 | Paper |
Dynamic lot-sizing problem with demand time windows and container-based transportation cost | 2008-01-04 | Paper |
Single machine scheduling under potential disruption | 2007-10-30 | Paper |
Two machine scheduling under disruptions with transportation considerations | 2007-05-15 | Paper |
Stochastic Flow-Shop Scheduling with Lateness-Related Performance Measures | 2007-01-19 | Paper |
A comparison of outbound dispatch policies for integrated inventory and transportation decisions | 2006-03-22 | Paper |
A two-echelon inventory optimization model with demand time window considerations | 2005-11-16 | Paper |
Analysis of algorithms for two‐stage flowshops with multi‐processor task flexibility | 2005-02-22 | Paper |
Machine scheduling with deliveries to multiple customer locations | 2005-02-09 | Paper |
Inventory replenishment model: lot sizing versus just-in-time delivery. | 2005-01-11 | Paper |
Machine scheduling with job delivery coordination | 2004-08-16 | Paper |
Scheduling patients in an ambulatory surgical center | 2003-10-29 | Paper |
Scheduling of depalletizing and truck loading operations in a food distribution system | 2003-10-29 | Paper |
Optimal outbound dispatch policies: Modeling inventory and cargo capacity | 2002-12-17 | Paper |
Machine scheduling with a rate-modifying activity | 2002-04-23 | Paper |
Single-machine scheduling with maintenance and repair rate-modifying activities | 2002-02-07 | Paper |
Parallel machine scheduling with a common due window | 2002-01-23 | Paper |
Workface planning in synchronous production systems | 2002-01-23 | Paper |
Scheduling jobs and maintenance activities on parallel machines | 2001-12-05 | Paper |
Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases | 2001-10-31 | Paper |
https://portal.mardi4nfdi.de/entity/Q2743967 | 2001-09-18 | Paper |
https://portal.mardi4nfdi.de/entity/Q2743969 | 2001-09-18 | Paper |
Machine scheduling with transportation considerations | 2001-05-07 | Paper |
A note on parallel machine scheduling with non-simultaneous machine available time | 2000-11-08 | Paper |
https://portal.mardi4nfdi.de/entity/Q4934199 | 2000-03-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q4238573 | 1999-10-04 | Paper |
Two-machine flowshop scheduling with availability constraints | 1999-08-02 | Paper |
Minimizing total completion time in two-processor task systems with prespecified processor allocations | 1999-06-27 | Paper |
Minimizing makespan on a single batch processing machine with dynamic job arrivals | 1999-06-08 | Paper |
Scheduling with agreeable release times and due dates on a batch processing machine | 1999-04-27 | Paper |
Current trends in deterministic scheduling | 1997-12-04 | Paper |
Workforce Planning in Mixed Model Assembly Systems | 1997-11-12 | Paper |
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint | 1997-08-05 | Paper |
Machine scheduling with an availability constraint | 1997-01-07 | Paper |
On the fixed interval due-date scheduling problem | 1996-10-03 | Paper |
On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date | 1996-08-06 | Paper |
Solving a Class Scheduling Problem with a Genetic Algorithm | 1996-03-12 | Paper |
Minimizing the error bound for the dynamic lot size model | 1996-01-07 | Paper |
A new dynamic programming algorithm for the single item capacitated dynamic lot size model | 1995-05-15 | Paper |
A dynamic programming algorithm for dynamic lot size models with piecewise linear costs | 1995-05-15 | Paper |
Minimizing makespan in hybrid flowshops | 1995-05-15 | Paper |
Error Bound of a Heuristic for the Common Due Date Scheduling Problem | 1994-03-24 | Paper |
Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem | 1994-01-02 | Paper |
Minimizing total completion time on a batch processing machine with job families | 1993-08-10 | Paper |
Capacitated two-parallel machines scheduling to minimize sum of job completion times | 1993-05-16 | Paper |
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations | 1993-01-17 | Paper |
A new dynamic programming algorithm for the parallel machines total weighted completion time problem | 1993-01-16 | Paper |
https://portal.mardi4nfdi.de/entity/Q3989986 | 1992-06-28 | Paper |
Single machine flow-time scheduling with scheduled maintenance | 1992-01-01 | Paper |
Parallel machines scheduling with nonsimultaneous machine available time | 1991-01-01 | Paper |
Error bound for the dynamic lot size model with backlogging | 1991-01-01 | Paper |
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date | 1991-01-01 | Paper |
The dynamic lot size model with quantity discount | 1990-01-01 | Paper |
Scheduling Precedence Graphs in Systems with Interprocessor Communication Times | 1989-01-01 | Paper |
Multiprocessor scheduling with interprocessor communication delays | 1988-01-01 | Paper |
Multiprocessor scheduling: Combining LPT and MULTIFIT | 1988-01-01 | Paper |
Rolling Planning Horizons: Error Bounds for the Dynamic Lot Size Model | 1986-01-01 | Paper |