A hybrid genetic algorithm for the resource-constrained project scheduling problem

From MaRDI portal
Revision as of 00:03, 3 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:2455614

DOI10.1016/J.EJOR.2006.12.033zbMath1137.90526OpenAlexW2054234206MaRDI QIDQ2455614

Vicente Valls, Francisco Ballestín, M. Sacramento Quintanilla

Publication date: 25 October 2007

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2006.12.033




Related Items (27)

A genetic algorithm for the robust resource leveling problemScheduling resource-constrained projects with a flexible project structureAn approach using SAT solvers for the RCPSP with logical constraintsA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingGenetic algorithm for the resource-constrained project scheduling problemGoing to the core of hard resource-constrained project scheduling instancesAn evolutionary approach for resource constrained project scheduling with uncertain changesHybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resourcesAn Improved Genetic Algorithm for the Resource-Constrained Project Scheduling ProblemMulti-mode resource-constrained project scheduling using RCPSP and SAT solversUnnamed ItemA hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durationsAn evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lagsA fuzzy time-dependent project scheduling problemResource tardiness weighted cost minimization in project schedulingTowards merging binary integer programming techniques with genetic algorithmsIntegrated scheduling and batch ordering for construction projectResource-constrained project scheduling with activity splitting and setup timesAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingA neurogenetic approach for the resource-constrained project scheduling problemResource Constrained Multi-Project Scheduling Problem with Resource Transfer TimesScheduling projects with limited number of preemptionsA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemActivity list representation for a generalization of the resource-constrained project scheduling problemA priority-rule method for project scheduling with work-content constraintsA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software



Cites Work




This page was built for publication: A hybrid genetic algorithm for the resource-constrained project scheduling problem