Rangen: A random network generator for activity-on-the-node networks

From MaRDI portal
Revision as of 01:33, 3 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:2464376


DOI10.1023/A:1022283403119zbMath1154.90440MaRDI QIDQ2464376

Mario Vanhoucke, Erik L. Demeulemeester, Willy S. Herroelen

Publication date: 20 December 2007

Published in: Journal of Scheduling (Search for Journal in Brave)


90B35: Deterministic scheduling theory in operations research


Related Items

Project scheduling and equipment planning with random breakdowns, A branch‐and‐bound algorithm for scheduling of new product development projects, On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment, The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework, Environmental regulation in project-based industries, A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure, A genetic algorithm for the robust resource leveling problem, Exact algorithms for single-machine scheduling with time windows and precedence constraints, Finding stable flows in multi-agent networks under an equal-sharing policy, Fast minimum float computation in activity networks under interval uncertainty, Scheduling modular projects on a bottleneck resource, Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem, Criticality analysis of activity networks under interval uncertainty, Robust resource allocations in temporal networks, A classification of predictive-reactive project scheduling procedures, A random generator of resource-constrained multi-project network problems, Parallel machine scheduling with precedence constraints and setup times, A survey of variants and extensions of the resource-constrained project scheduling problem, A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs, Computing project makespan distributions: Markovian PERT networks revisited, The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models, Finding an optimal Nash equilibrium to the multi-agent project scheduling problem, Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem, The preemptive stochastic resource-constrained project scheduling problem, A nearest neighbour extension to project duration forecasting with artificial intelligence, Capital- and resource-constrained project scheduling with net present value optimization, An effective heuristic for project scheduling with resource availability cost, A buffer control method for top-down project control, Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure, Moments and distribution of the net present value of a serial project, Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods, Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming, Project scheduling under uncertainty: survey and research potentials, Precedence theorems and dynamic programming for the single-machine weighted tardiness problem, Resource-constrained project scheduling with activity splitting and setup times, The impact of a limited budget on the corrective action taking process, The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds, Price of anarchy and price of stability in multi-agent project scheduling, A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search, Project selection, scheduling and resource allocation with time dependent returns, Uniform random posets, Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times, A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows, Robust Quadratic Programming with Mixed-Integer Uncertainty, Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations


Uses Software