Project scheduling with multiple modes: A comparison of exact algorithms

From MaRDI portal
Revision as of 10:19, 7 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4540083

DOI<link itemprop=identifier href="https://doi.org/10.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I" /><283::AID-NET5>3.0.CO;2-I 10.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-IzbMath1002.90025OpenAlexW2021285519MaRDI QIDQ4540083

Andreas Drexl, Sönke Hartmann

Publication date: 21 July 2002

Full work available at URL: https://doi.org/10.1002/(sici)1097-0037(199812)32:4<283::aid-net5>3.0.co;2-i




Related Items (24)

Multi-mode resource-constrained project scheduling problems with non-preemptive activity splittingAn exact composite lower bound strategy for the resource-constrained project scheduling problemFormulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)Project scheduling with finite or infinite number of activity processing modes -- a surveyMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicA new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.Lower bounds for resource-constrained project scheduling problems.Multi-mode resource-constrained project scheduling using RCPSP and SAT solversProperties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingA mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lagsConsidering project management activities for engineering design groupsA combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problemsProject scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous gridAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesReactive scheduling in the multi-mode RCPSPA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemTheoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy modelsA Branch-and-Bound method for solving Multi-Skill Project Scheduling ProblemProject selection, scheduling and resource allocation with time dependent returnsDifferential evolution for solving multi-mode resource-constrained project scheduling problemsResource-constrained project scheduling: Notation, classification, models, and methodsThe multi-mode resource-constrained project scheduling problem with generalized precedence relationsA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemSolving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms


Uses Software






This page was built for publication: Project scheduling with multiple modes: A comparison of exact algorithms