Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms

From MaRDI portal
Revision as of 17:04, 7 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:4661112

DOI10.1057/palgrave.jors.2601563zbMath1095.90541OpenAlexW2055522783MaRDI QIDQ4661112

Rubén Ruiz, Concepción Maroto, Javier Alcaraz

Publication date: 4 April 2005

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601563




Related Items (37)

Scheduling resource-constrained projects with a flexible project structureSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationA path-relinking algorithm for the multi-mode resource-constrained project scheduling problemPriority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingDesign and analysis of hybrid metaheuristics for the reliability \(p\)-median problemAn efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode caseIntegrated multi-project planning and scheduling -- a multiagent approachProject scheduling with finite or infinite number of activity processing modes -- a surveyMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemMulti-mode resource-constrained project scheduling using RCPSP and SAT solversProperties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingAn effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemTime and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centresAn efficient particle swarm optimizer with application to man-day project scheduling problemsConsidering project management activities for engineering design groupsMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemScheduling projects with heterogeneous resources to meet time and quality objectivesA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemMulti-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policiesProject scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous gridAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesParallel hybrid heuristics for the permutation flow shop problemA double genetic algorithm for the MRCPSP/maxReactive scheduling in the multi-mode RCPSPA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemSolving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristicsA survey of variants and extensions of the resource-constrained project scheduling problemA robust optimization approach for the multi-mode resource-constrained project scheduling problemA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsA multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problemA genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibilitySolving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms


Uses Software






This page was built for publication: Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms