zbMath Open mosheiov.gurDBLP73/6557WikidataQ29913224 ScholiaQ29913224MaRDI QIDQ190064

List of research outcomes





PublicationDate of PublicationType
A note: minmax due-window assignment with fixed earliness-tardiness costs2024-08-26Paper
Dynamic scheduling problems in theory and practice2024-07-23Paper
Single machine scheduling with step-learning2024-07-23Paper
Due-date assignment with acceptable lead-times on parallel machines2024-07-08Paper
Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection2024-03-27Paper
A note on batch scheduling on a two-machine flowshop with machine-dependent processing times2023-10-24Paper
On the minmax common-due-date problem: extensions to position-dependent processing times, job rejection, learning effect, uniform machines and flowshops2023-10-10Paper
A note: maximizing the weighted number of just-in-time jobs for a given job sequence2023-08-28Paper
The LPT heuristic for minimizing total load on a proportionate openshop2023-08-02Paper
A note on lot scheduling on a single machine to minimize maximum weighted tardiness2023-08-02Paper
Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity2023-07-04Paper
Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejection2023-06-27Paper
New Results On Sequencing With Rate Modification2023-05-05Paper
A Due-Window Determination In Minmax Scheduling Problems2023-04-24Paper
Multi-Machine Scheduling With Linear Deterioration2023-04-21Paper
On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates2022-11-04Paper
A greedy heuristic for solving scheduling problems with bounded rejection cost2022-06-22Paper
Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work2022-06-10Paper
Scheduling with competing agents, total late work and job rejection2022-03-07Paper
Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates2022-01-14Paper
Minmax due-date assignment on a two-machine flowshop2021-11-09Paper
A note on the single machine CON and CONW problems with lot scheduling2021-09-28Paper
Minimizing total late work on a single machine with generalized due-dates2021-06-07Paper
Minmax scheduling and due-window assignment with position-dependent processing times and job rejection2021-05-20Paper
Single machine lot scheduling with optional job-rejection2021-05-11Paper
Scheduling problems with a weight-modifying-activity2021-05-05Paper
Coupled task scheduling with convex resource consumption functions2021-03-25Paper
Flowshop scheduling with learning effect and job rejection2020-12-11Paper
Lot scheduling on a single machine to minimize the (weighted) number of tardy orders2020-10-07Paper
Minimizing total load on parallel machines with linear deterioration2020-04-27Paper
Comments on ``Proportionate flowshops with general position dependent processing times and ``Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection2019-05-10Paper
Single machine just‐in‐time scheduling problems with two competing agents2019-05-02Paper
Determining optimal sizes of bounded batches with rejection via quadratic min-cost flow2019-05-02Paper
A note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejection2019-03-06Paper
Batch scheduling with step-deteriorating processing times to minimize flowtime2019-03-05Paper
Two-machine flow shop and open shop scheduling problems with a single maintenance window2018-07-25Paper
Minmax scheduling with acceptable lead-times: extensions to position-dependent processing times, due-window and job rejection2018-07-11Paper
Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection2018-03-16Paper
Scheduling with two competing agents to minimize total weighted earliness2017-08-22Paper
A two-agent single machine scheduling problem with due-window assignment and a common flow-allowance2017-08-03Paper
A two-stage flow shop scheduling with a critical machine and batch availability2017-04-25Paper
Scheduling with job-rejection and position-dependent processing times on proportionate flowshops2017-04-20Paper
A single machine scheduling problem to minimize total early work2016-11-17Paper
Scheduling problems with two competing agents to minimized weighted earliness-tardiness2016-11-11Paper
A note: minmax due-date assignment problem with lead-time cost2016-11-10Paper
Batch scheduling of identical jobs with controllable processing times2016-11-10Paper
Scheduling a deteriorating maintenance activity and due-window assignment2016-11-10Paper
Minsum and minmax scheduling on a proportionate flowshop with common flow-allowance2016-10-07Paper
Due-window assignment problems with unit-time jobs2016-01-18Paper
Batch scheduling in a two-stage flexible flow shop problem2016-01-04Paper
Due-window assignment with identical jobs on parallel uniform machines2015-07-28Paper
A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop2014-12-09Paper
A note: minimizing maximum earliness on a proportionate flowshop2014-12-09Paper
Maximizing the weighted number of just-in-time jobs on a single machine with position-dependent processing times2014-08-18Paper
The optimal number of used machines in a two-stage flexible flowshop scheduling problem2014-08-18Paper
Minmax due-date assignment with a time window for acceptable lead-times2014-05-08Paper
An improved algorithm for due-window assignment on parallel identical machines with unit-time jobs2014-04-14Paper
Proportionate flowshops with general position-dependent processing times2013-04-04Paper
Scheduling job classes on uniform machines2012-11-15Paper
Batch scheduling on uniform machines to minimize total flow-time2012-11-15Paper
Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing times2012-11-15Paper
Scheduling on parallel identical machines with job-rejection and position-dependent processing times2012-10-23Paper
Batch scheduling of identical jobs on parallel identical machines2012-10-23Paper
Batch scheduling on a two-machine jobshop with machine-dependent setup times2012-06-18Paper
Single machine batch scheduling with two competing agents to minimize total flowtime2012-05-23Paper
https://portal.mardi4nfdi.de/entity/Q30711462011-02-01Paper
https://portal.mardi4nfdi.de/entity/Q30709282011-01-28Paper
Total absolute deviation of job completion times on uniform and unrelated machines2010-12-01Paper
Batch scheduling on two-machine flowshop with machine-dependent setup times2010-11-16Paper
Scheduling a deteriorating maintenance activity on a single machine2010-09-02Paper
The Browne-Yechiali single-machine sequence is optimal for flow-shops2010-06-11Paper
Scheduling problems with two competing agents to minimize minmax and minsum earliness measures2010-06-11Paper
Scheduling with a common due-window: polynomially solvable cases2010-03-11Paper
Single machine scheduling with batch-dependent setup times2010-01-18Paper
Scheduling identical jobs and due-window on uniform machines2009-11-17Paper
Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine2009-11-16Paper
Scheduling a maintenance activity to minimize total weighted completion-time2009-07-13Paper
A note: Simple heuristics for scheduling a maintenance activity on unrelated machines2009-05-19Paper
Scheduling a maintenance activity on parallel identical machines2009-04-22Paper
Scheduling a maintenance activity and due-window assignment on a single machine2009-04-03Paper
A multi-criteria scheduling with due-window assignment problem2009-03-23Paper
Minimizing total absolute deviation of job completion times: extensions to position-dependent processing times and parallel identical machines2009-03-03Paper
Minmax scheduling problems with a common due-window2009-02-12Paper
Due-date assignment on uniform machines2009-01-22Paper
A due-window assignment problem with position-dependent processing times2008-08-14Paper
An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs2008-04-28Paper
Due-date assignment and maintenance activity scheduling problem2008-04-17Paper
A single machine batch scheduling problem with bounded batch size2008-01-21Paper
Open-shop batch scheduling with identical jobs2008-01-21Paper
A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time2007-10-10Paper
Minmax scheduling with job-classes and earliness-tardiness costs2006-12-07Paper
Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs2006-04-28Paper
A note on scheduling deteriorating jobs2006-02-06Paper
Minimizing flow-time on a single machine with integer batch sizes2005-08-25Paper
Scheduling unit processing time jobs on an m-machine flow-shop2005-05-23Paper
Minimizing total completion time and total deviation of job completion times from a restrictive due-date2005-05-12Paper
Note on scheduling with general learning curves to minimize the number of tardy jobs2005-04-26Paper
Due-date assignment with asymmetric earliness–tardiness cost2005-04-04Paper
Parallel machine scheduling with a learning effect2005-03-16Paper
A note on a due-date assignment on a two-machine flow-shop2005-02-23Paper
Due-window assignment with unit processing-time jobs2005-02-22Paper
Flow-shop batch scheduling with identical processing-time jobs2005-01-11Paper
A note on flow-shop and job-shop batch scheduling with identical processing-time jobs2004-11-22Paper
Comments on Flow shop and open shop scheduling with a critical machine and two operations per job2004-08-16Paper
Simultaneous minimization of total completion time and total deviation of job completion times2004-08-16Paper
A note on the SPT heuristic for solving scheduling problems with generalized due dates2004-06-15Paper
A note on the maximum number of on-time jobs on parallel identical machines.2004-02-14Paper
Scheduling with general job-dependent learning curves.2003-05-19Paper
The solution of the soccer ``Dream League game2002-09-24Paper
Complexity analysis of job-shop scheduling with deteriorating jobs2002-05-15Paper
Scheduling problems with a learning effect2001-07-29Paper
Minmax earliness-tardiness costs with unit processing time jobs2001-07-12Paper
Minimizing maximum earliness on parallel identical machines2001-05-13Paper
https://portal.mardi4nfdi.de/entity/Q45269232001-01-31Paper
A common due-data assignment problem on parallel identical machines2001-01-01Paper
Asymptotic optimality in probability of a heuristic schedule for open shops with job overlaps1998-11-15Paper
Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs1998-01-25Paper
Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs1997-11-25Paper
Heuristics for multimachine minmax scheduling problems with general earliness and tardiness costs1997-11-25Paper
On trend estimation of time-series: a simple linear programming approach1997-07-23Paper
Λ-Shaped Policies to Schedule Deteriorating Jobs1997-03-31Paper
The pickup delivery location problem on networks1997-02-03Paper
Single machine scheduling to minimize the number of early and tardy jobs1996-07-24Paper
Greedy heuristics for single-machine scheduling problems with general earliness and tardiness costs1995-07-06Paper
Scheduling jobs under simple linear deterioration1995-04-17Paper
Minimizing the sum of job completion times on capacitated parallel machines1995-04-02Paper
The travelling salesman problem with pick-up and delivery1995-01-11Paper
The traveling salesman problem with delivery and backhauls1995-01-11Paper
https://portal.mardi4nfdi.de/entity/Q42879851994-04-19Paper
V-Shaped Policies for Scheduling Deteriorating Jobs1992-09-26Paper
Smoothing time-series data by nonmetric polytone curves1988-01-01Paper