Capital- and resource-constrained project scheduling with net present value optimization
From MaRDI portal
Publication:1752257
DOI10.1016/j.ejor.2016.07.019zbMath1394.90285OpenAlexW2501972505MaRDI QIDQ1752257
Mario Vanhoucke, Pieter Leyman
Publication date: 24 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/629253
Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models ⋮ Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap ⋮ Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty ⋮ Considering project management activities for engineering design groups ⋮ A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects ⋮ An updated survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Investment decisions and sensitivity analysis: NPV-consistency of rates of return
Uses Software
Cites Work
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- A population-based approach to the resource-constrained project scheduling problem
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- Simulated annealing and tabu search for multi-mode project payment scheduling
- Scheduling subject to resource constraints: Classification and complexity
- An iterative scheduling technique for resource-constrained project scheduling
- Project network models with discounted cash flows a guided tour through recent developments
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
- A steepest ascent approach to maximizing the net present value of projects
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Progress payments in project scheduling problems.
- Project scheduling with inventory constraints
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- Rangen: A random network generator for activity-on-the-node networks
- Multi-mode project payment scheduling problems with bonus-penalty structure
- Principles of scatter search
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Project Contracts and Payment Schedules: The Client's Problem
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- Project scheduling: The effects of problem structure on heuristic performance
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows
- Scheduling project activities to maximize the net present value the case of linear time-dependent cash flows
- On modelling payments in projects
- Maximizing the net present value of a project with linear time-dependent cash flows
- Cash Flows in Networks
- Handbook of metaheuristics
- A two stage search heuristic for scheduling payments in projects