Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
Publication:1150305
DOI10.1016/0377-2217(81)90348-9zbMath0455.90049OpenAlexW1973812366MaRDI QIDQ1150305
Publication date: 1981
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(81)90348-9
resource allocationrenewable resourcesnonrenewable resourcesmaximum latenessproject durationcost criteriaefficient usemultiobjective network schedulingmultiple conflicting criteria
Applications of mathematical programming (90C90) Sensitivity, stability, parametric optimization (90C31) Deterministic scheduling theory in operations research (90B35)
Related Items (45)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Fuzzy programming and linear programming with several objective functions
- Goal programming and multiple objective optimizations. Part I
- ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- An Interactive Programming Method for Solving the Multiple Criteria Problem
- Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H]
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- An Algorithm for the Traveling Salesman Problem
- Linear programming with multiple objective functions: Step method (stem)
- Problems and methods with multiple objective functions
- An Effective Heuristic Algorithm for the Traveling-Salesman Problem
This page was built for publication: Multiobjective network scheduling with efficient use of renewable and nonrenewable resources