Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
From MaRDI portal
Publication:1590046
DOI10.1016/S0377-2217(99)00498-1zbMath0990.90058OpenAlexW2014349223MaRDI QIDQ1590046
Klaus Neumann, Jürgen Zimmermann
Publication date: 19 December 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00498-1
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (28)
A metaheuristic solution approach for the time-constrained project scheduling problem ⋮ A genetic algorithm for the robust resource leveling problem ⋮ A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints ⋮ Which fuzzy ranking method is best for maximizing fuzzy net present value? ⋮ Energy-oriented scheduling based on evolutionary algorithms ⋮ A branch and bound algorithm for project scheduling problem with spatial resource constraints ⋮ Mixed-integer linear programming for resource leveling problems ⋮ A common approximation framework for early work, late work, and resource leveling problems ⋮ The total adjustment cost problem: applications, models, and solution algorithms ⋮ Resource leveling in projects with flexible structures ⋮ Order-based neighborhoods for project scheduling with nonregular objective functions. ⋮ Resource leveling in a machine environment ⋮ Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space ⋮ R\&D pipeline management: task interdependencies and risk management ⋮ Exact methods for the resource levelling problem ⋮ A cost optimization model for multiresource leveling problem without project duration constraint ⋮ Considering project management activities for engineering design groups ⋮ The bilevel optimisation of a multi-agent project scheduling and staffing problem ⋮ Scheduling tests in automotive R\&D projects ⋮ Optimizing version release dates of research and development long-term processes ⋮ Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems ⋮ Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure ⋮ A master surgical scheduling approach for cyclic scheduling in operating room departments ⋮ Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Project selection, scheduling and resource allocation with time dependent returns ⋮ Maximizing the net present value of a project under uncertainty ⋮ Simulated annealing and tabu search for multi-mode project payment scheduling
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A comparison of stochastic scheduling rules for maximizing project net present value
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations
- Project network models with discounted cash flows a guided tour through recent developments
- Optimal resource leveling using non-serial dynamic programming
- Active and stable project scheduling
- Resource levelling for projects with schedule-dependent time windows
- Optimal resource profiles for program scheduling
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Cash Flows in Networks
- The payment scheduling problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
This page was built for publication: Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints