Justification and RCPSP: a technique that pays

From MaRDI portal
Revision as of 07:50, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1772841

DOI10.1016/J.EJOR.2004.04.008zbMath1066.90045OpenAlexW2000872583MaRDI QIDQ1772841

Vicente Valls, Francisco Ballestín, M. Sacramento Quintanilla

Publication date: 21 April 2005

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2004.04.008




Related Items (51)

New strategies for stochastic resource-constrained project schedulingA polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemThe multi-mode resource-constrained multi-project scheduling problem, The MISTA 2013 challengeAn integer programming approach to the multimode resource-constrained multiproject scheduling problemAn approach using SAT solvers for the RCPSP with logical constraintsModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsSolving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computationExperimental investigation of heuristics for resource-constrained project scheduling: an updateThree insertion heuristics and a justification improvement heuristic for two-dimensional bin packing with guillotine cutsA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingGenetic algorithm for the resource-constrained project scheduling problemGoing to the core of hard resource-constrained project scheduling instancesProduction scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithmProject scheduling with finite or infinite number of activity processing modes -- a surveyAn Improved Genetic Algorithm for the Resource-Constrained Project Scheduling ProblemNew concepts for activity float in resource-constrained project managementR\&D pipeline management: task interdependencies and risk managementMulti-mode resource-constrained project scheduling using RCPSP and SAT solversUnnamed ItemA hybrid metaheuristic for the resource-constrained project scheduling problemTri-directional scheduling scheme: theory and computationAn evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lagsA hybrid genetic algorithm for the resource-constrained project scheduling problemA random key based genetic algorithm for the resource constrained project scheduling problemTowards merging binary integer programming techniques with genetic algorithmsTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesOptimizing version release dates of research and development long-term processesAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesResource-constrained project scheduling with activity splitting and setup timesPre-emption in resource-constrained project schedulingNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingA double genetic algorithm for the MRCPSP/maxA neurogenetic approach for the resource-constrained project scheduling problemTheoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problemsA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemA learning-based optimization approach to multi-project schedulingTheoretical insights into the augmented-neural-network approach for combinatorial optimizationA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemEfficient priority rules for the stochastic resource-constrained project scheduling problemProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingScheduling projects with limited number of preemptionsA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemAn efficient genetic algorithm for decentralized multi-project scheduling with resource transfersActivity list representation for a generalization of the resource-constrained project scheduling problemAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsOn the use of genetic programming to evolve priority rules for resource constrained project scheduling problemsA matheuristic for a 2-echelon vehicle routing problem with capacitated satellites and reverse flowsA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem


Uses Software



Cites Work




This page was built for publication: Justification and RCPSP: a technique that pays