Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation

From MaRDI portal
Revision as of 09:38, 31 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1266547

DOI10.1016/0377-2217(95)00357-6zbMath0916.90151OpenAlexW2067462952WikidataQ111605540 ScholiaQ111605540MaRDI QIDQ1266547

Rainer Kolisch

Publication date: 7 October 1998

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(95)00357-6




Related Items (94)

Meta-heuristic solution with considering setup time for multi-skilled project scheduling problemNew strategies for stochastic resource-constrained project schedulingA flow-based tabu search algorithm for the RCPSP with transfer timesMachine scheduling in underground mining: an application in the potash industryA polarized adaptive schedule generation scheme for the resource-constrained project scheduling problemAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemMIP models for resource-constrained project scheduling with flexible resource profilesSolving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programmingScheduling resource-constrained projects with a flexible project structurePractical solutions for a dock assignment problem with trailer transportationAn adaptive large neighborhood search for the full truckload pickup and delivery problem with resource synchronizationA path-relinking algorithm for the multi-mode resource-constrained project scheduling problemExperimental investigation of heuristics for resource-constrained project scheduling: an updateModeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfersPriority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingA filter-and-fan approach with adaptive neighborhood switching for resource-constrained project schedulingOn the integration of diverging material flows into resource-constrained project schedulingSimple heuristics for scheduling with limited intermediate storageEvolutionary algorithms for multi-objective stochastic resource availability cost problemGenetic algorithm for the resource-constrained project scheduling problemA genetic algorithm for resource investment project scheduling problem, tardiness permitted with penaltyA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesAttaining flexibility in seru production system by means of Shojinka: an optimization model and solution approachesA compact reformulation of the two-stage robust resource-constrained project scheduling problemAn efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode caseScheduling modular projects on a bottleneck resourceHeuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemptionProject scheduling with finite or infinite number of activity processing modes -- a surveyMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicResource constraint scheduling with a fractional shared resourceA constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsA new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer timesModeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networksA two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staffA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesProperties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingA hybrid metaheuristic for the resource-constrained project scheduling problemAn effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problemProject scheduling with flexible resources: formulation and inequalitiesExplaining the \texttt{cumulative} propagatorA performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignmentA multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problemSolving the resource-constrained project scheduling problem by a variable neighbourhood search.Tri-directional scheduling scheme: theory and computationNew representation to reduce the search space for the resource-constrained project scheduling problemA hybrid genetic algorithm for satellite image downlink scheduling problemAn iterated local search algorithm for a place scheduling problemConsidering project management activities for engineering design groupsMulti-project scheduling with two-stage decompositionA branch and bound method for the job-shop problem with sequence-dependent setup timesSolving the resource-constrained project scheduling problem using filter-and-fan approachA random key based genetic algorithm for the resource constrained project scheduling problemRevenue sharing for resource reallocation among project activity contractorsTowards merging binary integer programming techniques with genetic algorithmsCase-based reasoning and improved adaptive search for project schedulingScheduling tests in automotive R\&D projectsAn approximate dynamic programming approach to project scheduling with uncertain resource availabilitiesInsertion Algorithms with Justification for Solving the Resource-Constrained Project Scheduling ProblemA market-based multi-agent system model for decentralized multi-project schedulingAugmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problemAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemMulti-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relationsFirst Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project StructureNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingDynamic transport scheduling under multiple resource constraintsEvent-based MILP models for resource-constrained project scheduling problemsA neurogenetic approach for the resource-constrained project scheduling problemA hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problemA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemSolving the discrete time/resource trade-off problem in project scheduling with genetic algorithmsEfficient priority rules for the stochastic resource-constrained project scheduling problemA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingMinimizing total weighted late work in the resource-constrained project scheduling problemProject selection, scheduling and resource allocation with time dependent returnsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingComputing lower bounds by destructive improvement: An application to resource-constrained project schedulingResilience analysis for project scheduling with renewable resource constraint and uncertain activity durationsAn Optimal Constraint Programming Approach to the Open-Shop ProblemThe Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM FrameworkAn efficient multi-pass heuristic for project scheduling with constrained resourcesPSPLIB -- a project scheduling problem libraryActivity list representation for a generalization of the resource-constrained project scheduling problemDistribution requirements and compactness constraints in school timetablingOn the use of genetic programming to evolve priority rules for resource constrained project scheduling problemsA priority-rule method for project scheduling with work-content constraintsBidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projectsExperimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problemA multicriteria heuristic method to improve resource allocation in multiproject schedulingResource-constrained project scheduling through the goal programming model: integration of the manager's preferencesWorkforce routing and scheduling for electricity network maintenance with downtime minimizationSchedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis



Cites Work


This page was built for publication: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation